Services and Capabilities
- Scope
- Work Breakdown Structure (WBS)
- Communication Plan
- Risk Management Plan
- Integrated Master Plan (IMP)
- Integrated Master Schedule (IMS)
- Critical Path Method (CPM) Scheduling
- Validation
- Feasibility
- Business Case and Need
- Key Performance Indicators (KPI)
- Project Initiation Document (PID)
Planning & Scheduling
- 3D Model Quality, Quantity Extraction / Verification
- Review 3D Design and constructability analysis against schedule.
- 4D Animations and corresponding training documents
- 4D Scheduling / Simulation
- 3D, 4D, 5D, and 5.5D specifications
- Set up 3D Model, 3D filters and groups per Schedule WBS.
- Link 3D model to Schedule
- Resource or cost loadings models
- Conduct visual walkthroughs
- Visualize animations with cost and Earned Value
- Baseline and status models
- Develop reports and deliverables
- Digital Twins
Virtual Design & Construction
- Baseline Schedule and Constructability Analysis
- Schedule Update Analysis
- Schedule Quality Assurance and Control
- Risk Analysis
- Time Impact Analysis
- Schedule Disruption Analysis
- Productivity Impact Evaluations
- Acceleration Claims
- Damages Computation
- Claim Preparation & Presentation (Bilingual-English and Spanish)
- Construction Mediation, Litigation & Arbitration
- Support (Bilingual–English and Spanish)
- Expert Testimony (Bilingual – English and Spanish)