Services and Capabilities

    Planning & Scheduling
  • Scope
  • Work Breakdown Structure (WBS)
  • Communication Plan
  • Risk Management Plan
  • Integrated Master Plan (IMP)
  • Integrated Master Schedule (IMS)
  • Critical Path Method (CPM) Scheduling
  • Validation
  • Feasibility
  • Business Case and Need
  • Key Performance Indicators (KPI)
  • Project Initiation Document (PID)
    Virtual Design & Construction
  • 3D Model Quality, Quantity Extraction / Verification
  • Review 3D Design and constructability analysis against schedule.
  • 4D Animations and corresponding training documents
  • 4D Scheduling / Simulation
  • 3D, 4D, 5D, and 5.5D specifications
  • Set up 3D Model, 3D filters and groups per Schedule WBS.
  • Link 3D model to Schedule
  • Resource or cost loadings models
  • Conduct visual walkthroughs
  • Visualize animations with cost and Earned Value
  • Baseline and status models
  • Develop reports and deliverables
  • Digital Twins
    Claims Avoidance & Management
  • Baseline Schedule and Constructability Analysis
  • Schedule Update Analysis
  • Schedule Quality Assurance and Control
  • Risk Analysis
  • Time Impact Analysis
  • Schedule Disruption Analysis
  • Productivity Impact Evaluations
  • Acceleration Claims
  • Damages Computation
  • Claim Preparation & Presentation (Bilingual-English and Spanish)
  • Construction Mediation, Litigation & Arbitration
  • Support (Bilingual–English and Spanish)
  • Expert Testimony (Bilingual – English and Spanish)